8  Federal States Data

8.1 Energy Production

8.1.1 Fossils

Table 8.1: Energy Production - Fossils - Natural Gas Production (10⁶ m³): Paraná state includes shale gas.
Table 8.2: Energy Production - Fossils - Unit: %.

8.1.2 Electricity Generation and Alcohol Production

Table 8.3: Energy Production – Electricity Generation and Alcohol Production. Electricity Generation (GWh): Including generation from self producers.
Table 8.4: Energy Production – Electricity Generation and Alcohol Production. Unit: %.

8.1.3 Electricity Generation by Source

Table 8.5: Electricity Generation by source and year. Unit: GWh.

8.2 Electricity Residential Consumption

Table 8.6: Electricity Residential Consumption. Absolute values. Unit: GWh.
Table 8.7: Electricity Residential Consumption. Percentage values. Unit: (%).

8.3 LPG Residential Consumption

Table 8.8: LPG Residential Consumption. Absolute values. Unit: 10³ m³. Small differences between the data from this table and the ones in other tables in this publication could occur due to different criteria of depuration.
Table 8.9: LPG Residential Consumption. Percentage values. Unit: (%). Small differences between the data from this table and the ones in other tables in this publication could occur due to different criteria of depuration.

8.4 Installed Capacity of Electricity Generation

8.4.1 Installed Capacity of Electricity Generation (Public Service and Self-Producers)

Table 8.10: Installed Capacity of Electricity Generation. Absolute values. Unit: MW. SP - Public Service (it includes Independent Producers). APE – Self Producer (including the partnership between hydroeletric plants with Public Service concessionaries, as: Igarapava, Canoas I and II, Funil, Porto Estrela, Machadinho and others). Equitable distribution for border plant. Does not include Distributed Generation.
Table 8.11: Installed Capacity of Electricity Generation. Percentage values. Unit: (%). SP - Public Service (it includes Independent Producers). APE – Self Producer (including the partnership between hydroeletric plants with Public Service concessionaries, as: Igarapava, Canoas I and II, Funil, Porto Estrela, Machadinho and others). Equitable distribution for border plant. Does not include Distributed Generation.

8.4.2 Installed Capacity of Mini and Micro Distributed Generation (MMDG)

Table 8.12: Installed Capacity of Mini and Micro Distributed Generation - Part 1. Unit: MW.
Table 8.13: Installed Capacity of Mini and Micro Distributed Generation - Part 2. Unit: %.

8.5 Installed Capacity for Electricity Generation of Self-Producers by Economic Sector

8.5.1 Agriculture and Livestock

Table 8.14: Installed Capacity for Electricity Generation of Self-Producers - Agriculture and Livestock. Absolute values. Unit: MW. Does not include Distributed Generation.
Table 8.15: Installed Capacity for Electricity Generation of Self-Producers - Agriculture and Livestock. Percentage values. Unit: %. Does not include Distributed Generation.

8.5.2 Commercial

Table 8.16: Installed Capacity for Electricity Generation of Self-Producers - Commercial. Absolute values. Unit: MW. Does not include Distributed Generation.
Table 8.17: Installed Capacity for Electricity Generation of Self-Producers - Commercial. Percentage values. Unit: %. Does not include Distributed Generation.

8.5.3 Public

Table 8.18: Installed Capacity for Electricity Generation of Self-Producers - Public. Absolute values. Unit: MW. Does not include Distributed Generation.
Table 8.19: Installed Capacity for Electricity Generation of Self-Producers - Public. Percentage values. Unit: %. Does not include Distributed Generation.

8.5.4 Residential

Table 8.20: Installed Capacity for Electricity Generation of Self-Producers - Residential. Absolute values. Unit: MW. Does not include Distributed Generation.
Table 8.21: Installed Capacity for Electricity Generation of Self-Producers - Residential. Percentage values. Unit: %. Does not include Distributed Generation.

8.5.5 Energy Sector

Table 8.22: Installed Capacity for Electricity Generation of Self-Producers - Energy Sector. Absolute values. Unit: MW. Does not include Distributed Generation.
Table 8.23: Installed Capacity for Electricity Generation of Self-Producers - Energy Sector. Percentage values. Unit: %. Does not include Distributed Generation.

8.5.6 Transportation

Table 8.24: Installed Capacity for Electricity Generation of Self-Producers - Transportation. Absolute values. Unit: MW. Does not include Distributed Generation.
Table 8.25: Installed Capacity for Electricity Generation of Self-Producers - Transportation. Percentage values. Unit: %. Does not include Distributed Generation.

8.6 Installed Capacity for Electricity Generation of Self-Producers by Industrial Segment

Table 8.26: Installed Capacity for Electricity Generation of Self-Producers by Industrial Segment. Absolute values. Unit: MW. Does not include Distributed Generation.
Table 8.27: Installed Capacity for Electricity Generation of Self-Producers by Industrial Segment. Percentage values. Unit: (%). Does not include Distributed Generation.

8.7 Installed Capacity

Table 8.28: Installed Capacity. Source: ANP. Oil Refinery: Nominal Capacity. Paraná: It includes shale oil. Pernambuco: The refinery RNEST started operation on 6 december of 2014, Autorized by ANP (operation) nº 506/2014. Does not include Distributed Generation.
Table 8.29: Installed Capacity. Unit: %. Does not include Distributed Generation.

8.8 Proved Reserves and Hydraulic Potential

Table 8.30: Proved Reserves and Hydraulic Potential. Unit: Indicated in each variable. Hydraulic Potential MW: Sources: SIPOT - Brazilian Hydroelectric Potential System; Aneel. % from total: Percentages are calculated considering the equal distribution between neighbor plants. Does not include Distributed Generation.
Table 8.31: Proved Reserves and Hydraulic Potential. Unit: %. Does not include Distributed Generation.