Annex I.1 Installed Capacity of Electricity Generation
Table 1: Installed Capacity of Electricity Generation. Unit: MW. PS - Public Service/ IEP - Independent Energy Producer/ APE - Self-producer. Hydro: It includes half of Itaipu Power Plant. PS and/or IEP: Does not include part of traditional Self-Producer power capacity. Self-Producers: IEP Plants, traditionally Self-Producers, are classified as Self-Producers. Solar: Photovoltaic.
Figure 1: Installed Capacity of Electricity Generation.
Annex I.2 Installed Capacity of Electricity Generation of Itaipu
Table 2: Installed Capacity of Electricity Generation of Itaipu. Unit: MW.
Annex I.3 Installed Capacity of Electricity Generation by Source
Table 3: Installed Capacity of Electricity Generation by Source. Unit: MW. Others: Includes Tar. Gaseous Effluent: Includes process heat.
Annex I.4 Installed Capacity of Distributed Generation by Source
Table 4: Installed Capacity of Distributed Generation by Source. Unit: MW.
Annex I.5 Installed Capacity of Oil Refining
Table 5: Installed Capacity of Oil Refining. 2014: The refinery RNEST started operation on 6 december of 2014, Autorized by ANP (operation) nº 506/2014.
Figure 2: Installed Capacity of Oil Refining.
Annex I.6 Installed Capacity of Biodiesel Production
Table 6: Installed Capacity of Biodiesel Production. Source: Nation Agency for Oil, Gas and Biofuels (ANP).